Detailed Construction Drawings

A more comprehensive service would include full construction drawings, construction notes and a schedule of works. The construction drawings would provide key setting-out requirements and detail specific areas of the design including sectional drawings and design detail. These would typically be accompanied by a set of construction notes that would specify the products and materials that should be used. A detailed schedule of works would break down and itemise each element of the build process and enable these to be easily quantified and priced. The schedule of works can be a very useful tool in specifying requirements, obtaining like for like quotations from contractors and analysing project costs.

Cost for this level of service would start from around 2000